There are 45 φ1000mm steel pipe piles and 33 φ1500mm cast-in-place piles for pier trestle, torch trestle and tower platform in this project. The number of steel piles covered in this project is 81, including 61 steel pipe piles of pier and 20 steel pipe piles of torch pier.